LD 818
pg. 2
Page 1 of 2 An Act To Specify Phosphorus Limits for Gulf Island Pond LD 818 Title Page
Download Bill Text
LR 906
Item 1

 
rulemaking.__For purposes of this subsection, "total maximum daily
load" means the amount of phosphorus discharge permitted to enter
an impaired water body such that the water quality standards will
be met, and the impairment removed, when discharge limits are held
to this amount.

 
5.__Effective date.__This section takes effect November 1,
2005.

 
SUMMARY

 
This bill specifies standards for the cumulative discharge of
phosphorus, both in terms of phosphorus and orthophosphorus, for
licensed waste discharges into Gulf Island Pond. The bill
requires the Department of Environmental Protection to deny or
reissue all expired licenses for continuation of waste discharges
contributing phosphorus to Gulf Island Pond by November 15, 2005.
Each licensee found to contribute to nonattainment of the
standards contained in this bill must provide for phosphorus
reductions so the standards are met within the 5-year license
period. Alternatively, the bill allows the department to specify
a standard based upon an EPA-approved total maximum daily load
that does not cause algae blooms in Gulf Island Pond.


Page 1 of 2 Top of Page LD 818 Title Page