| 4.__Federal Environmental Protection Agency approval of |
phosphorous load.__The limits on phosphorous discharges in |
subsection 2 and license requirements in subsection 3 apply |
unless the department issues and the federal Environmental |
Protection Agency approves, before or after the effective date of |
this section, a total maximum daily load of phosphorous that |
prevents algae blooms that impair recreation in and on the water |
and improves the dissolved oxygen levels in Gulf Island Pond.__ |
The total maximum daily load approved under this subsection must |
be implemented through the waste discharge licenses and water |
quality certifications of all facilities that contribute to the |
nonattainment of dissolved oxygen criteria or the nonattainment |
of the designated use of recreation in and on the water.__The |
implementation of the total maximum daily load does not require |