| Be it enacted by the People of the State of Maine as follows: |
|
| | Sec. 1. 35-A MRSA §3203, sub-§2, ¶D, as amended by PL 1999, c. 398, | Pt. J, §1, is further amended to read: |
|
| D. Evidence of the ability to satisfy the renewable | resource portfolio requirement established under section | 3210 3210-A; |
|
| | Sec. 2. 35-A MRSA §3210, as amended by PL 1999, c. 372, §§1 and 2 | and c. 398, Pt. I, §§1 to 3, is repealed. |
|
| | Sec. 3. 35-A MRSA §3210-A is enacted to read: |
|
| §3210-A.__Renewable resources |
|
| | 1.__Policy.__In order to ensure a secure, adequate and | reliable supply of electricity for state residents and to | maintain and increase the State's use of renewable and | indigenous resources, it is the policy of this State to | encourage the generation of electricity from renewable sources | and to diversify electricity production on which residents of | this State rely in a manner consistent with this section. |
|
| | 2.__Eligible renewable resource.__As used in this section, | "eligible renewable resource" means an electrical generation | facility that: |
|
| A.__Generates power in this State or generates power that | is physically delivered to consumers in this State; and |
|
| B.__Does not exceed 100 megawatts in total generating | capacity, unless otherwise indicated, and that relies on | one or more of the following fuel sources: |
|
| (1)__Fuel cells that use hydrogen produced by | electricity generated by a renewable fuel; |
|
| (3)__Solar arrays and installations; |
|
| (6)__Hydroelectricity with a capacity that does not | exceed 30 megawatts; |
|
|