|
including appurtenant structures that might be located | in an upland area. |
|
| B.__Construction of a temporary structure does not require | a permit. |
|
| | Sec. 12. 38 MRSA §480-Q, sub-§2, ¶¶C and D, as repealed and replaced by | PL 1995, c. 27, §1, are amended to read: |
|
| C. There is no additional intrusion into the protected | natural resource; and |
|
| D. The dimensions of the repaired structure do not exceed | the dimensions of the structure as it existed 24 months | prior to the repair, or if the structure has been | officially included in or is considered by the Maine | Historical Preservation Commission eligible for listing in | the National Register of Historic Places, the dimensions | of the repaired structure do not exceed the dimensions of | the historic structure.; and |
|
| | Sec. 13. 38 MRSA §480-Q, sub-§2, ¶E is enacted to read: |
|
| E.__The foundation type and the dimensions of the | foundation remain the same. |
|
| | Sec. 14. 38 MRSA § 480-Q, sub-§26 is enacted to read: |
|
| | 26.__Underground storage tank.__The maintenance and repair | are to an underground storage tank in any area regulated by | this article. |
|
| | Sec. 15. 38 MRSA §480-W, as enacted by PL 1995, c. 230, §1, is | repealed. |
|
| | Sec. 16. 38 MRSA §§480-AA to 480-EE are enacted to read: |
|
| §480-AA.__Standards for all projects |
|
| | 1__Time frame for building reconstruction.__All building | reconstruction that does not qualify as maintenance and repair | under section 480-B, subsection 5-C and section 480-Q, | subsection 2 requires a permit.__The building to be | reconstructed must exist on the date an application for such a | permit is accepted for processing by the department or must | have lawfully existed within one year of the date an | application is accepted for processing by the department. |
|
| | 2.__Development on individual lots.__Development on an | individual lot is restricted by this subsection. |
|
|