|
|
|
|
|
|
|
|
128th MAINE LEGISLATURE |
|
|
LD 529 |
|
LR 1397(01) |
|
|
|
An Act To Ensure
Resiliency of the Maine Electrical Grid |
|
Preliminary Fiscal
Impact Statement for Original Bill |
|
Sponsor: Rep. Rykerson of Kittery |
|
Committee: Energy, Utilities and Technology |
|
Fiscal Note Required: No |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Preliminary
Fiscal Impact Statement |
|
|
|
|
|
|
|
Minor cost increase - Other Special Revenue Funds |
|
|
|
|
|
|
|
Fiscal Detail
and Notes |
|
|
|
|
|
|
Any additional
costs to the Public Utilities Commission to require transmission and
distribution utilities to take steps to ensure their systems are protected
from geomagnetic disturbances and electromagnetic pulses and to undertake
certain mitigation measures can be absorbed within existing budgeted
resources. |
|
|
|
|
|
|
|