‘Sec. 3. Reimbursement for cost of analysis. Resolved: That, upon obtaining final authorization to construct an east-west highway, the developer shall reimburse the Department of Transportation for the cost of the analysis under section 1.’
SP0570 LD 1671 |
Second Regular Session - 125th Maine Legislature H "B" to C "A", Filing Number H-805, Sponsored by CEBRA
|
LR 2358 Item 5 |
|
Bill Tracking, Additional Documents | Chamber Status |
Amend the amendment in section 2 in the last line (page 1, line 24 in amendment) by striking out the following: "2013." and inserting the following: '2013; and be it further'
Amend the amendment by inserting at the end before the summary the following:
‘Sec. 3. Reimbursement for cost of analysis. Resolved: That, upon obtaining final authorization to construct an east-west highway, the developer shall reimburse the Department of Transportation for the cost of the analysis under section 1.’
Summary
This amendment provides that, upon obtaining final authorization to construct an east-west highway, the developer must reimburse the Department of Transportation for the cost of the independent traffic and revenue analysis.