‘Sec. 1. 35-A MRSA §3132, sub-§5-A is enacted to read:
(1) That the construction and operation of the proposed transmission line reduces electricity costs for consumers, is necessary to meet the reliability requirements imposed by the Federal Energy Regulatory Commission or its designated electric reliability organization or is otherwise needed for local reliability; and
(2) That public need exists for the proposed transmission line pursuant to paragraph B.
Sec. 2. 35-A MRSA §3132, sub-§6, as amended by PL 2009, c. 615, Pt. A, §1 and c. 655, Pt. A, §4, is repealed.