SP0246 LD 802 |
First Regular Session - 125th Maine Legislature C "B", Filing Number S-197, Sponsored by
|
LR 1735 Item 2 |
|
Bill Tracking, Additional Documents | Chamber Status |
Amend the bill in section 1 in subsection 6 by striking out all of the blocked paragraph (page 1, lines 37 to 41 in L.D.)
SUMMARY
This amendment is the majority report. The amendment strikes the requirement that a proposed transmission line either reduce the costs for consumers or be necessary to meet reliability requirements for a certificate of public convenience and necessity to be issued by the Public Utilities Commission.