An Act To Make Minor Adjustments to Laws Administered by the Department of Environmental Protection
Sec. 1. 38 MRSA §341-H, sub-§1, as enacted by PL 2011, c. 304, Pt. H, §14, is amended to read:
Sec. 2. 38 MRSA §342, sub-§11-B, as enacted by PL 2011, c. 304, Pt. H, §17, is amended to read:
For the purposes of this subsection, "license" includes any license, permit, order, approval or certification issued by the department and "licensee" means the holder of the license.
Sec. 3. 38 MRSA §342, sub-§11-C is enacted to read:
Sec. 4. 38 MRSA §344, sub-§9, as enacted by PL 1989, c. 890, Pt. A, §27 and affected by §40, is amended to read:
Sec. 5. 38 MRSA §347-A, sub-§5, as amended by PL 2007, c. 292, §12, is further amended to read:
Sec. 6. 38 MRSA §347-A, sub-§6, ¶A, as enacted by PL 1997, c. 794, Pt. A, §5, is amended to read:
Sec. 7. 38 MRSA §348, sub-§1, as amended by PL 2007, c. 292, §13, is further amended to read:
Sec. 8. 38 MRSA §480-Q, sub-§31, as reallocated by RR 2011, c. 1, §61, is amended to read:
Sec. 9. 38 MRSA §480-Y, sub-§3, ¶¶A and C, as enacted by PL 1995, c. 659, §1, are amended to read:
Sec. 10. 38 MRSA §480-Y, sub-§4, ¶A, as enacted by PL 1995, c. 659, §1, is amended to read:
(1) The application cover sheet, as provided by the department;
(2) The United States Geological Survey topographical map with the boundaries of the farm and the pond site clearly marked;
(3) A photograph of the stream at the proposed dam site;
(4) A copy of the irrigation plan for the farm;
(5) Site plans showing existing and proposed topography, stream channel location, existing wetland boundaries, maximum and normal pool elevation, normal pool elevation elevations for a pond in a river, stream or brook, dam footprints, pond inlet and outlet location locations, emergency spillway location, access roads, stockpile locations and buffer strips;
(6) Cross sections through the dam and outlet structure, including proposed maximum pool elevation and normal pool elevation;
(7) A plan to maintain minimum flow downstream, including any calculations used to create the plan;
(8) A complete erosion control plan using practices contained in the "Maine Erosion and Sediment Control Handbook for Construction: Best Management Practices" (1991) unless otherwise approved or required by the department. The erosion control plan must include a narrative with a sequence for implementing the plan, provisions to inspect and maintain erosion controls and a site plan showing locations of control measures. The plan must include provisions for maintaining a dry construction site. These provisions may consist of construction during a no-flow period, a temporary cofferdam or a stream diversion. The erosion control plan must also include provisions for dewatering and disposal of dredged and excavated soil material. The disposal of soil material dredged from the stream must comply with the requirements of the State's solid waste management rules;
(9) Test pit logs and test results from a minimum of 2 test pits dug in the footprint of the dam and results of tests done under the direction of a professional engineer on the dam fill material; and
(10) A copy of the property deed, lease, purchase and sale agreement or other legal document establishing that the applicant has title or right to or interest in the property proposed for pond development.
All design materials used to show that the dam design meets the standards of the general permit must be signed and stamped by a professional engineer.
Sec. 11. 38 MRSA §570-E, as amended by PL 1999, c. 334, §7, is repealed.
Sec. 12. 38 MRSA §590-A, first ¶, as enacted by PL 1987, c. 279, is amended to read:
The term of air emission licenses is 5 10 years, except that the term of licenses for air contaminant sources subject to the state permitting provisions of 40 Code of Federal Regulations, Part 70 is 5 years and licenses issued pursuant to rules adopted pursuant to section 580-B, subsection 4, paragraph D have no term. The board may establish, by rule, shorter license terms for the following source categories as it deems considers necessary to protect the public health, safety and welfare:
Sec. 13. 38 MRSA §1400 is enacted to read:
§ 1400. Rules
Subject to Title 5, chapter 375, the department may adopt rules as it determines necessary to implement this chapter. Rules adopted pursuant to this section are major substantive rules as defined in Title 5, chapter 375, subchapter 2-A.
Sec. 14. Transition. An air emission license issued for a term of 5 years pursuant to the Maine Revised Statutes, Title 38, section 590-A that is in effect on the effective date of this Act is effective for 10 years upon renewal of that license.
summary
This bill makes minor changes to the laws administered by the Department of Environmental Protection to remove inconsistencies and inefficiencies and make grammatical changes.
The bill makes 2 substantive changes. The term of an air emission license is changed from 5 years to 10 years, with certain exceptions, including a term of 5 years for a license for an air contaminant source subject to the provisions of 40 Code of Federal Regulations, Part 70 and no term for a license issued pursuant to the carbon dioxide cap-and-trade program under the Maine Revised Statutes, Title 38, section 580-B. The bill clarifies that the Commissioner of Environmental Protection need not provide notice and opportunity for hearing before recommending that the board modify or take corrective action. The board's process, in Title 38, section 341-D, subsection 3, provides opportunity for hearing.