|
(c) Solar arrays and installations; |
|
| (d) Wind power installations; |
|
| (e) Geothermal installations; |
|
| (f) Hydroelectric generators; |
|
| (g) Biomass generators; or |
|
| (h) Generators fueled by municipal solid waste in | conjunction with recycling. |
|
| | Sec. 3. 35-A MRSA §3210, sub-§2, ¶D is enacted to read: |
|
| D. "Tier 2 renewable resource" means a source of electrical | generation that generates power that is scheduled for | delivery and delivered to the control region in which the | New England Power Pool, or its successor as approved by the | Federal Energy Regulatory Commission, has authority over | transmission, or to the Maritimes Control Area; that does | not sell its electrical output to a transmission and | distribution utility pursuant to a contract entered into | prior to March 1, 2000; and that satisfies one of the | following criteria: |
|
| (1) Was built after January 1, 2005 and relies on one | or more of the following: |
|
| (c) Solar arrays and installations; |
|
| (d) Wind power installations; |
|
| (e) Geothermal installations; |
|
| (f) Hydroelectric generators; or |
|
| (g) Landfill gas installations; |
|
| (2) Is a hydroelectric generator in which a fish passage system | has been installed after January 1, 2005 and that did not have a | fish passage system prior to that date.__For a hydroelectric | generator to qualify under this subparagraph, the Commissioner of | Marine Resources must certify that the generator had no fish |
|
|