| (2) The borrower must be an entrant to natural resource | enterprises; |
|
| (3) The loan must be made for the purpose of financing all | or part of the purchase price of agricultural land and | other eligible collateral; and |
|
| (4) The interest rate on the loan must be significantly | less than the market interest rate, if required by the | authority; and |
|
| | Sec. 20. 10 MRSA §1023-D, sub-§3, as amended by PL 2001, c. 231, §3, | is further amended to read: |
|
| | 3. Application of fund. Money in the fund may be applied to | carry out any power of the authority under this section or under | or in connection with section 1026-F 1026-A, subsection 1, | paragraph A, subparagraph (1), division (b), including, but not | limited to, to pledge or transfer and deposit money in the fund | as security for and to apply money in the fund in payment of | principal, interest and other amounts due on insured loans. | Except as otherwise prohibited under this subsection, money in | the fund may be used for direct loans or grants for all or part | of underground oil storage facility projects, underground oil | storage tank projects, aboveground oil storage tank or facility | construction or replacement projects or gasoline service station | vapor control or petroleum liquids transfer vapor recovery | projects when the authority determines that: |
|
| A. One or more of the following circumstances exists: |
|
| (1) The underground oil storage facility or tank is | leaking or has been identified by the Department of | Environmental Protection as posing an environmental | threat, or removal is required by applicable law; |
|
| (2) The applicant is required to install equipment | related to the improvement of air quality pursuant to | requirements for gasoline service station vapor control | and petroleum liquids transfer vapor recovery; |
|
| (3) The applicant is constructing, replacing or | renovating a tank or facility used for the aboveground | storage of oil and the work is supervised by a state- | registered professional engineer with training and | experience in aboveground oil storage facility | installation; or |
|
| (4) The applicant is renovating an underground oil storage tank | or facility, the work is supervised by an |
|
|